Building control charge schedules for controllable building works with an estimated cost less than £150,000.
Since 2 January 2019 loft conversion fees have been the same as extensions.
-
Charges schedule only
- File type:
- Size: 180.66 KB
-
Regularisation charges schedule only
- File type:
- Size: 181.07 KB